Fence Calculator: Plan Your Fence Materials and Budget Easily

Report


        
    

How to Use

Follow these steps to get an estimate for your fence project:

  1. Enter the length and width of the area where you plan to install the fence.
  2. Select the measurement unit: feet or meters.
  3. Choose your desired material.
  4. Input the cost per foot of the material.
  5. Enter the number of posts and gates you plan to use.
  6. Specify the terrain type. This will help adjust the cost and time.
  7. Enter the labor rate per hour.
  8. Click Calculate to get the estimated cost and construction time.
  9. Click Visualize Project to see a simple representation of your fence.
  10. Review the detailed report below the calculator.
  11. Click Download Report to save the report as a PDF.

Tips for Accurate Estimates

  • Measure Accurately: Double-check your measurements for best results.
  • Terrain Considerations: Uneven terrain may require more labor and materials.
  • Material Choices: Consider the durability and maintenance requirements of different materials.
  • Labor Rates: Labor costs can vary by location. Use a typical rate in your area.
  • Get Multiple Quotes: This tool is an estimate. Check with local providers for specific quotes.

Material Cost Examples

Here is a table showing approximate costs per foot for common fencing materials:

MaterialApproximate Cost per Foot
Wood$5 – $15
Vinyl$8 – $20
Chainlink$3 – $10
OtherVariable

Terrain Impact

Here’s how different terrains can affect the project cost and time:

  • Flat: Standard calculations apply. No additional cost multiplier.
  • Sloped: Adds a 20% to costs to account for the extra effort.
  • Uneven: Adds a 30% costs due to complexity.

Labor Cost Calculation

Labor costs are based on the perimeter of the fence, the labor rate per hour, and the terrain:

Labor Cost = (Perimeter / 20) * Labor Rate * Terrain Multiplier

Example Calculation

For example, If your perimeter is 200 feet, the labor rate is $30 per hour, and the terrain is sloped (1.2x), then

Labor Cost = (200 / 20) * 30 * 1.2 = $360

Frequently Asked Questions

What does ‘cost per foot’ mean?

This is the cost of the fencing material per linear foot. It does not include posts, gates, or labor.

How is the total cost calculated?

Total cost is the sum of the material, posts, gates, and labor costs, multiplied by the terrain multiplier.

How is the construction time calculated?

Construction time is calculated based on perimeter of the fence divided by 20 and multiplied by the terrain multiplier. This gives a rough estimate in number of days.

Can I use this calculator for any type of fence?

Yes, the calculator is designed to work with various fencing materials and terrains, but it is still an estimate. Always verify with local contractors.